Funicular railway inspection from 5th March 2018

(vom 05.02.2018)

The funicular railways will be undergoing a safety check once again this year. For this reason the upper und the lower funicular will not be running from 5th to 18th March. A replacement bus service will be operating.

back

Discover the funicular railways

Beispielbild Nr.1 Beispielbild Nr.2 Beispielbild Nr.3
Beispielbild Nr.4 Beispielbild Nr.5 Beispielbild Nr.6

Technical details

The Heidelberg funicular railway has a total length of 1.5 kilometres, making it the longest in Germany today. At its steepest point the railway has a 43% gradient.

Tips

Discover the four funicular stations.

 

© Heidelberger Straßen- und Bergbahn GmbH